国产AV成人片无码_日韩成人午夜福利_动漫黄在线观看免费视频_99e热久久精品首页_少妇白洁av免费在线观看_色视频一区二区三区_女人的天堂国产av_人妻制服丝袜有码中文字幕_亚洲av最新精品每天更新_亚洲色图欧美色图在线视频国产中文

unified benefit
Location: Home > > Case Two

Ltd., Suzhou, planning 55 injection moulding machines, water, electricity, gas, centralised material supply system in one of the whole plant system. Water supply system, taking into account the number of machines, water supply distance and water pressure and flow and temperature and health control have high requirements for the system configured with high-power explosion rod machine, water storage tanks, square water towers and other equipment to ensure that meet the requirements. The use of 4 with 2 standby high head and high flow loading station to ensure uninterrupted operation of the system.

Central feeding system planning programme in order to achieve a great use of the workshop area, the corner of the workshop to build a steel platform. Stainless steel storage barrels and central console are placed under the platform, and central vacuum generator and energy-saving dry manipulator are placed on the platform to provide conveying power and drying treatment for raw materials. Because the drying equipments are many and centralised, the upper floor of the platform is closed with fireproof cotton rock boards, and there are 12 exhaust fans installed on the upper floor of the platform for discharging the centralised heat out of the workshop, which greatly reduces the temperature of the workshop. The noise of the vacuum generator is also reduced through the barrier, which greatly improves the working environment.

未標題-5.jpg

CopyRight © 2024Dongguan Tongyi Plastic Machinery Manufacturing Co., Ltd Sitemap
WeChat

【W(wǎng)eChat】

Link: